Xray
all clusters 1h 6h 24h 48h 3d 5d 7d 14d 30d ‹
Last 1 hour▾
Ends now. Anything up to this cluster's 30-day retention.
Start and end times
Cancel
Interpreted in UTC (change it at the right of this bar). Earliest available: 2026-10-24 12:08:22.
› →|
updated 6d ago
Sample data. This database was generated by scripts/seed_dev_db.py — every service, deploy, person and figure on this page is synthetic. Names are sample.*@seed.invalid and image tags are prefixed SEED-. Nothing here happened.

Test cases › Sites › Staff list

TC-SITE-077 Changing the study in the assign dialog clears the site and role already chosen Medium

revision 1 · last changed 7d ago by import from the test management tool

Role
CRO organization member
Preconditions
Organization type: CRO. Signed in to a licensed CRO organization with a staff member and at least two studies running at different sites.
Passes when
Changing the study clears both the site and the role beneath it.
Source
Implementation (UI)
Observations
The start and end date fields are not cleared when the study changes, so a person can be left with dates chosen while the role above them is blank and the date fields themselves cannot be used.

Steps

#StepExpected result
1Open the assign to study dialog and choose a study, a site and a role.All three are shown as chosen.
2Change the study to a different one.The site and the role are both cleared, and the role selector can no longer be used.
3Choose a site again.The role selector becomes usable and holds no previous value.

Automated tests (0)

None. An automated test is tied to this case when its title or source cites TC-SITE-077.