Test cases › Studies › SMO overview
TC-STD-036 Changing the date range refreshes every panel on the overview High
revision 1 · last changed 7d ago by import from the test management tool
- Role
- SMO organization member
- Preconditions
- Organization type: SMO. Signed in to an SMO organization holding a study with activity over more than one period.
- Test data
- None.
- Passes when
- A change of date range is applied to all of the overview's panels at once.
- Source
- Live observation; Implementation (UI) · verified 2026-10-19
- Observations
- The study available for walking had no activity in any period, so the panels showed the no-data message for every range and a change could not be told apart.
Steps
| # | Step | Expected result |
|---|---|---|
| 1 | Open a study's overview and note the figures shown in the visit execution row. | The figures shown cover the last thirty days. |
| 2 | Open the date range dropdown and choose a different period. | The dropdown's caption changes to the chosen period. |
| 3 | Read the panels again. | Every panel on the overview has reloaded and now reports the chosen period, not the previous one. |
Automated tests (0)
None. An automated test is tied to this case when its title or source cites TC-STD-036.